Are you thinking about adding a gate on your second story condo? Have an existing gate that you would like to repair or replace? The board has published guidelines for the installation, repair, and replacement of these gates, which were not original to the development. Any such installations or replacements require approval of The Board. Read the guidelines for all the details.
The architectural control and approval is critical to protect the buildings and specifically to protect the integrity of the deck waterproofing from damage that can occur during, or as part of the installation. Do not attempt to install any 2nd story gates on your own, or without approval from The Board.